Frontier Certified — Trial Program Brief

Prepared by: Frontier Engineering · For: Microsoft · Status: Draft for discussion · Date: 3 November 2026

1. Purpose

This brief proposes a trial of the Frontier Certified program with one consulting firm. It sets out what the trial would test and which decisions we need from Microsoft to start. The trial would prove the format, the learning outcomes and the certificate process before scaling toward 10,000 learners.

2. Program in one paragraph

Frontier Certified is a Microsoft-branded, in-person program that equips consulting firms to deliver frontier AI engineering on GitHub Copilot, Microsoft Foundry and Microsoft Fabric, using Microsoft’s open-source HVE (Hypervelocity Engineering) Core as the working method. Frontier Engineering builds the content and teaches the workshops. Learners earn a Microsoft-issued certificate by passing a hands-on practical, not an exam. Firms gain people who can lead AI delivery for their clients; Microsoft gains a partner ecosystem that drives adoption of its platform.

3. Trial objectives

ObjectiveHow we’ll measure it
Learners can apply HVE on the Microsoft stack≥ 80% pass the graded practical
The format works for a mixed audienceNPS ≥ 50 overall and for each role path
The environment is plug-and-play≥ 90% working before day 1; < 30 min lost to setup per learner
Skills improve measurablyPre/post hands-on task: time to working result and quality score
Certificate process runs end to endResults delivered to Microsoft’s issuing process within 10 business days
The model can scaleCapacity and cost per learner validated against the 10,000 target

4. Proposed trial design

Participants. One consulting firm, one cohort of 24–30 people, nominated by the firm. Suggested mix: about two-thirds technical (software, data, architects) and one-third delivery (project managers, engagement leads).

Format. 3 days in person at a Microsoft or firm office. A lead instructor and one assistant from Frontier. About 80% of the time is hands-on.

Teams. Learners work in mixed teams of 4–5 that mirror a real engagement team: builders, a data engineer, an architect and a delivery lead.

Sample project. A fictional insurer wants an AI agent to triage incoming claims. Teams use Fabric for the claims data, Foundry for the agent, and GitHub Copilot with HVE to build, review and hand it over. All data is synthetic.

Environment. One click into a browser-based development environment with Copilot, HVE Core, Foundry and Fabric already configured. Learners don’t install anything on their laptops. A setup check runs the week before.

Agenda (draft)

Technical pathDelivery pathTogether
Day 1 — MethodHVE Research → Plan → Implement → Review cycle on the starter repo with CopilotHVE project lifecycle: scoping, decision points, review gatesKickoff, agentic engineering principles, team formation
Day 2 — BuildFabric data foundation; Foundry agent built through HVEEstimating and planning with agents, governance, risk, client adoptionMidday and end-of-day team demos
Day 3 — Ship & certifyEvaluations, security, responsible AIHandover plan, client communicationGraded practical (half day) and final demo

How the certificate is earned

  • Individual assessment within team work. Each learner submits their own work: HVE plans, reviews and code (technical path), or engagement plan and governance decisions (delivery path). A short walkthrough with an instructor confirms it.
  • Rubric covers five areas: method, context engineering, product use, quality and safety, delivery readiness.
  • Frontier sends the results to Microsoft, which issues the certificate.

Optional: deployment phase pilot

A subset of 2–3 teams applies the method to a real or internal project for 8 weeks. They join fortnightly check-ins and submit a final evidence pack. This tests the deployment phase on a small scale before it becomes part of the program.

5. Decisions we’re asking Microsoft to make

For each decision, we give the options and our recommendation.

A. Workshop length

OptionInstructor need for 10,000 learners (over 2 years)Note
2 days, 40 per cohort~5 full-time instructorsLowest cost; little depth for technical roles
3 days, 25 per cohort ✅~8 full-time instructorsBalanced; recommended for the trial
4 days, 20 per cohort~13–14 full-time instructorsDeepest; hardest to scale
Role-based (3 days technical, 1.5 days delivery)~6 full-time instructorsStrong option once the trial has validated the role paths

B. Deployment phase

  1. None. The certificate is earned in the workshop.
  2. Self-reported evidence pack, with light review.
  3. ✅ Team-based deployment with a reviewed evidence pack. It’s credible and keeps reviews manageable: about 2,500 team reviews instead of 10,000 individual ones.

C. What firms may claim

  1. ✅ Individual certificates only. Firms say “N Frontier Certified professionals.” This is simple and hard to misuse, so we recommend it for launch.
  2. A firm designation once a firm reaches a set number of certified people and completed deployments.
  3. Firm tiers based on certified headcount, deployments and client references.

D. Delivery at scale

  1. Frontier instructors deliver every cohort.
  2. ✅ Frontier delivers the trial and early cohorts, then trains and licenses additional instructors under Frontier quality assurance. This is the only way we see to reach 10,000 learners on a reasonable timeline.

6. What we need from Microsoft

  • Program owner and content approval contact, with an agreed review turnaround
  • Certificate issuance process and the data format it needs from us
  • Brand kit and usage guidelines for workshop materials
  • Lab resources: Azure, Fabric and GitHub Copilot tenants or credits for learners
  • Funding model for the trial and rollout
  • Marketing terms, including how Frontier Engineering is credited
  • Introduction to the trial firm, and agreement on nomination criteria
  • Decisions A–D above

7. Timeline (weeks from approval)

WeekMilestone
0Brief approved; trial firm confirmed
2Curriculum outline and assessment rubric to Microsoft for review
5Environment built and tested; content complete
6Internal dry run; fixes
7Learner setup checks
8Trial workshop
10Results report and certificates issued
18Deployment phase pilot readout (if included)

8. Key risks

RiskMitigation
HVE Core and the products change quicklyPin versions per cohort; recheck before each delivery
Setup problems eat workshop timeBrowser-based environment, pre-checks, backup accounts
Firm restrictions (data, models, network)Synthetic data; confirm firm constraints at nomination
Mixed skill levels in one roomPlacement pre-assessment, role paths, mixed teams, stretch labs
Cloud costs per learnerSpending caps, auto-pause, shared capacity where possible
Instructor capacity at scaleDecision D: licensed instructors with Frontier quality assurance

Internal — remove before sending

Sources and open items behind this brief: